What This Looks Like
The planning session produces a feature that will take four to six weeks to complete. The feature is assigned to two developers. For the next six weeks, they work in a shared branch, building the backend, the API layer, the UI, and the database migrations as one interconnected unit. The branch grows. The diff between their branch and main reaches 3,000 lines. Other developers cannot see their work because it is not merged until it is finished.
On completion day, the branch merge is a major event. Reviewers receive a pull request with 3,000 lines of changes across 40 files. The review takes two days. Conflicts with main branch changes have accumulated while the feature was in progress. Some of the code written in week one was made redundant by decisions made in week four, but nobody is quite sure which parts are now dead code. The merge happens. The feature ships. For a few hours, the team holds its breath.
From the outside, this looks like normal development. The feature is done when it is done. The alternative - delivering a feature in pieces - seems to require the feature to be “half shipped,” which nobody wants. So the team ships features whole. And each whole feature takes longer to build, longer to review, longer to test, longer to merge, and produces more production surprises than smaller, incremental deliveries would.
Common variations:
- The feature branch that lives for months. A feature with many components grows in a long-lived branch. By the time it is ready to merge, the branch has diverged significantly from main. Integration is a major project in itself.
- The “it’s not done until all parts are done” constraint. The team does not consider merging parts of a feature because the product owner or stakeholders define “done” as the complete, user-visible feature. Intermediate states are considered undeliverable by definition.
- The UI-last integration. Backend work is complete and merged. UI work is complete in a separate branch. The two halves are integrated at the end. Integration surfaces mismatches between what the backend provides and what the UI expects, late in the cycle.
- The “save it all for the big release” pattern. Multiple features are kept undeployed until they can be released together for marketing or business reasons. The deployment batch grows over weeks and is released in a single event.
The telltale sign: the word “feature” is synonymous with a unit of work that takes weeks and ships as a single deployment, and the team cannot describe how they would ship the same functionality in smaller pieces.
Why This Is a Problem
The size of a change determines its risk, its cost to review, its cost to debug, and its time in flight before reaching users. Big-bang feature delivery maximizes all of these costs simultaneously. Every property of a large change is worse than the equivalent properties of the same work done incrementally.
It reduces quality
Quality problems in a large feature have a long runway before discovery. A design mistake made in week one is not discovered until the feature is complete and tested - potentially five weeks later. By that point, the design decision has influenced every other component of the feature. Reversing it requires touching everything that was built on top of it.
Code review quality degrades with change size. A reviewer presented with a 50-line diff can give it detailed attention and catch subtle issues. A reviewer presented with a 3,000-line diff faces an impossible task. They will review the most prominent parts carefully and skim the rest. Defects in the skimmed sections reach production because reviews at that scale are necessarily superficial.
Test coverage is also harder to achieve for large features. Testing a complete feature as a unit means constructing test scenarios that span the full scope of the feature. Intermediate states - which may represent how the feature will actually behave under real usage patterns - are never individually tested.
Incremental delivery forces the team to define and verify quality at each increment. Each small merge is reviewable in detail. Each intermediate state is tested independently. Problems are caught when the affected code is fresh and the context is clear.
It increases rework
When a large feature reveals a problem at integration time, the scope of rework is proportional to the size of the feature. A misunderstanding about how a backend API should structure its response, discovered at the end of a six-week feature, requires changes to the backend, updates to the API contract, changes to the UI components consuming the API, and updates to any tests written against the original API shape. All of this work was built on a faulty assumption that could have been caught much earlier.
Large features also suffer from internal rework that never appears in the commit log. Code written in week one and refactored in week three represents work done twice. Approaches tried and abandoned in the middle of a large feature are invisible overhead. Teams underestimate the real cost of their large features because they do not account for the internal rework that happens before the feature is ever reviewed or tested.
Merge conflicts compound rework further. A feature branch that lives for four weeks will accumulate conflicts with the changes that other developers made during those four weeks. Resolving those conflicts takes time, and the resolution itself can introduce bugs. The longer the branch lives, the worse the conflict situation becomes - exponentially, not linearly.
It makes delivery timelines unpredictable
Large features hide risk until late in the cycle. The first three weeks of a six-week feature often feel like progress - code is being written, components are taking shape. The final week or two is where the risk surfaces: integration problems, performance issues, edge cases the design did not account for. The timeline slips because the risk was invisible during the planning and early development phases.
The “it’s done when it’s done” nature of big-bang delivery makes it impossible to give stakeholders accurate, current information. At three weeks into a six-week feature, the team may say they are “halfway done” - but “halfway done” for a large feature does not mean the first half is delivered and working. It means the second half is still entirely unknown risk.
Incremental delivery provides genuinely useful progress signals. When a vertical slice of functionality is deployed and working in production after one week, the team has delivered real value and has real data about what works and what does not. The remaining work is scoped against actual production behavior, not against a specification written before any code existed.
Impact on continuous delivery
Continuous delivery operates on the principle that small, frequent changes are safer than large, infrequent ones. Big-bang feature delivery is the inverse: large, infrequent changes that maximize blast radius. Every property of CD - fast feedback, small blast radius, easy rollback, predictable timelines - is degraded by large feature units.
CD also depends on the ability to merge to the main branch frequently. A feature that lives in a branch for four weeks is not being integrated continuously. The developer is integrating with a stale view of the codebase. When they finally merge, they are integrating weeks of drift all at once. The continuous in continuous delivery requires that integration happens continuously, not once per feature.
Feature flags make incremental delivery possible for complex features that cannot be user-visible until complete. The code merges continuously to main behind a flag. The feature is not visible to users until the flag is enabled. The delivery is continuous even though the user-visible release happens at a defined moment.
How to Fix It
Step 1: Distinguish delivery from release (Week 1)
Separate the concept of deployment from the concept of release. The most common objection to incremental delivery is “we cannot ship a half-finished feature to users” - but this conflates the two:
- Deployment means the code is running in production.
- Release means users can see and use the feature.
These are separable. Code can be deployed behind a feature flag, completely invisible to users, while the feature is built incrementally over several weeks. When the feature is complete, the flag is enabled. The release happens without a deployment. This resolves the “half-finished” objection.
Run a working session with the team and product stakeholders to explain this distinction. Agree that “delivering incrementally” does not mean “exposing incomplete features to users.”
Step 2: Practice decomposing a current feature into vertical slices (Week 1-2)
Take a feature currently in planning and decompose it into the smallest possible deliverable slices:
- Identify the end state: what does the fully-delivered feature look like?
- Work backward: what is the smallest possible version of this feature that provides any value at all? This is the first slice.
- What addition to that smallest version provides the next unit of value? This is the second slice.
- Continue until the full feature is covered.
A vertical slice cuts through all layers of the stack: it includes backend, API, UI, and tests for one small piece of end-to-end functionality. It is the opposite of “first we build all the backend, then all the frontend.” Each slice is deployable independently.
Step 3: Implement a feature flag for the current feature (Week 2-3)
For the feature being piloted, add a feature flag:
- Add a configuration-based feature flag that defaults to off.
- Gate the feature’s entry points behind the flag in the codebase.
- Begin merging incremental work to the main branch behind the flag.
- The feature is invisible in production until the flag is enabled, even as components are deployed.
This allows the team to merge small, reviewable changes to main continuously while maintaining the product constraint that the feature is not user-visible until complete.
Step 4: Set a maximum story size (Week 2-3)
Define a maximum size for individual work items that the team will carry at any one time:
- A story should be completable within one or two days, not one or two weeks.
- A story should result in a pull request that a reviewer can meaningfully review in under an hour - typically under 400 lines of net new code.
- A story should be mergeable to main independently without requiring other stories to ship first (with the feature flag pattern enabling this for user-visible work).
The team will initially find it uncomfortable to decompose work to this granularity. Run decomposition workshops using the feature in Step 2 as practice material.
Step 5: Change the definition of “done” for a story (Week 3-4)
Redefine “done” to require deployment, not just code completion. A story is done when:
- The code is merged to main.
- The CI pipeline passes.
- The change is deployed to staging (or production behind a flag).
“Code complete” in a branch is not done. “In review” is not done. “Waiting for merge” is not done. This definition forces small batches because a story that cannot be merged to main is not done, and a story that cannot be merged to main is probably too large.
Step 6: Retrospect on the first feature delivered incrementally (Week 4-6)
After completing the pilot feature using incremental delivery, hold a focused retrospective:
- How did the review experience compare to large feature reviews?
- Were integration problems caught earlier?
- Did the timeline feel more predictable?
- What decomposition decisions could have been better?
Use the retrospective findings to refine the decomposition practice and the maximum story size guideline.
| Objection | Response |
|---|---|
| “Our features are too complex to decompose into small pieces” | Every feature that has ever been built was built one small piece at a time - the question is whether those pieces are integrated continuously or accumulated in a branch. Take your current most complex feature and run the vertical slice decomposition from Step 2 on it - most teams find at least three independently deliverable slices within the first hour. |
| “Product management defines features, not the team - we cannot change the batch size” | Product management defines what users see, not how code is organized or deployed. Introduce the deployment-vs-release distinction in your next sprint planning. Product management can still plan user-visible features of any size; the team controls how those features are delivered underneath. |
| “Our system requires all components to be updated together” | This is an architectural constraint worth addressing. Backward-compatible changes, API versioning, and the expand-contract pattern allow components to be updated independently. Pick one tightly coupled interface, apply the expand-contract pattern this sprint, and measure whether the next change to that interface requires coordinated deployment. |
| “Code review takes the same amount of time regardless of batch size” | This is not supported by evidence. Review quality and thoroughness decrease sharply with change size. Track actual review time and defect escape rate for your next five large reviews versus your next five small ones - the data will show the difference. |
Measuring Progress
| Metric | What to look for |
|---|---|
| Work in progress | Should decrease as stories are smaller and move through the system faster |
| Development cycle time | Should decrease as features are broken into deliverable slices |
| Integration frequency | Should increase as developers merge to main more often |
| Average pull request size (lines changed) | Should decrease toward a target of under 400 net lines |
| Lead time | Should decrease as features in flight are smaller and complete faster |
| Production incidents per deployment | Should decrease as smaller deployments carry less risk |
Related Content
- Work Decomposition - The practice of breaking large features into small, deliverable slices
- Feature Flags - The mechanism that enables incremental delivery of user-invisible work
- Small Batches - The principle that small changes are safer and faster than large ones
- Monolithic Work Items - A closely related anti-pattern at the story level
- Horizontal Slicing - The anti-pattern of building all the backend before any frontend