Small Batches
7 minute read
Phase 3 - Optimize | Adapted from MinimumCD.org
Batch size is the single biggest lever for improving delivery performance. This page covers what batch size means at every level - deploy frequency, commit size, and story size - and provides concrete techniques for reducing it.
Why Batch Size Matters
Large batches create large risks. When you deploy 50 changes at once, any failure could be caused by any of those 50 changes. When you deploy 1 change, the cause of any failure is obvious.
This is not a theory. The DORA research consistently shows that elite teams deploy more frequently, with smaller changes, and have both higher throughput and lower failure rates. Small batches are the mechanism that makes this possible.
“If it hurts, do it more often, and bring the pain forward.”
- Jez Humble, Continuous Delivery
Three Levels of Batch Size
Batch size is not just about deployments. It operates at three distinct levels, and optimizing only one while ignoring the others limits your improvement.
Level 1: Deploy Frequency
How often you push changes to production.
| State | Deploy Frequency | Risk Profile |
|---|---|---|
| Starting | Monthly or quarterly | Each deploy is a high-stakes event |
| Improving | Weekly | Deploys are planned but routine |
| Optimizing | Daily | Deploys are unremarkable |
| Elite | Multiple times per day | Deploys are invisible |
How to reduce: Remove manual gates, automate approval workflows, build confidence through progressive rollout. If your pipeline is reliable (Phase 2), the only thing preventing more frequent deploys is organizational habit.
Level 2: Commit Size
How much code changes in each commit to trunk.
| Indicator | Too Large | Right-Sized |
|---|---|---|
| Files changed | 20+ files | 1-5 files |
| Lines changed | 500+ lines | Under 100 lines |
| Review time | Hours or days | Minutes |
| Merge conflicts | Frequent | Rare |
| Description length | Paragraph needed | One sentence suffices |
How to reduce: Practice TDD (write one test, make it pass, commit). Use feature flags to merge incomplete work. Pair program so review happens in real time.
Level 3: Story Size
How much scope each user story or work item contains.
A story that takes a week to complete is a large batch. It means a week of work piles up before integration, a week of assumptions go untested, and a week of inventory sits in progress.
Target: Every story should be completable - coded, tested, reviewed, and integrated - in two days or less. If it cannot be, it needs to be decomposed further.
Behavior-Driven Development for Decomposition
BDD provides a concrete technique for breaking stories into small, testable increments. The Given-When-Then format forces clarity about scope.
The Given-When-Then Pattern
Each scenario becomes a deliverable increment. You can implement and deploy the first scenario before starting the second. This is how you turn a “discount feature” (large batch) into three independent, deployable changes (small batches).
Decomposing Stories Using Scenarios
When a story has too many scenarios, it is too large. Use this process:
- Write all the scenarios first. Before any code, enumerate every Given-When-Then for the story.
- Group scenarios into deliverable slices. Each slice should be independently valuable or at least independently deployable.
- Create one story per slice. Each story has 1-3 scenarios and can be completed in 1-2 days.
- Order the slices by value. Deliver the most important behavior first.
Example decomposition:
| Original Story | Scenarios | Sliced Into |
|---|---|---|
| “As a user, I can manage my profile” | 12 scenarios covering name, email, password, avatar, notifications, privacy, deactivation | 5 stories: basic info (2 scenarios), password (2), avatar (2), notifications (3), deactivation (3) |
Vertical Slicing
A vertical slice cuts through all layers of the system to deliver a thin piece of end-to-end functionality. This is the opposite of horizontal slicing, where you build all the database changes, then all the API changes, then all the UI changes.
Horizontal vs. Vertical Slicing
Horizontal (avoid):
Story 1: Build the database schema for discounts
Story 2: Build the API endpoints for discounts
Story 3: Build the UI for applying discounts
Problems: Story 1 and 2 deliver no user value. You cannot test end-to-end until story 3 is done. Integration risk accumulates.
Vertical (prefer):
Story 1: Apply a simple percentage discount (DB + API + UI for one scenario)
Story 2: Reject expired discount codes (DB + API + UI for one scenario)
Story 3: Apply discounts only to eligible items (DB + API + UI for one scenario)
Benefits: Every story delivers testable, deployable functionality. Integration happens with each story, not at the end. You can ship story 1 and get feedback before building story 2.
How to Slice Vertically
Ask these questions about each proposed story:
- Can a user (or another system) observe the change? If not, slice differently.
- Can I write an end-to-end test for it? If not, the slice is incomplete.
- Does it require all other slices to be useful? If yes, find a thinner first slice.
- Can it be deployed independently? If not, check whether feature flags could help.
Practical Steps for Reducing Batch Size
Week 1-2: Measure Current State
Before changing anything, measure where you are:
- Average commit size (lines changed per commit)
- Average story cycle time (time from start to done)
- Deploy frequency (how often changes reach production)
- Average changes per deploy (how many commits per deployment)
Week 3-4: Introduce Story Decomposition
- Start writing BDD scenarios before implementation
- Split any story estimated at more than 2 days
- Track the number of stories completed per week (expect this to increase as stories get smaller)
Week 5-8: Tighten Commit Size
- Adopt the discipline of “one logical change per commit”
- Use TDD to create a natural commit rhythm: write test, make it pass, commit
- Track average commit size and set a team target (e.g., under 100 lines)
Ongoing: Increase Deploy Frequency
- Deploy at least once per day, then work toward multiple times per day
- Remove any batch-oriented processes (e.g., “we deploy on Tuesdays”)
- Make deployment a non-event
Key Pitfalls
1. “Small stories take more overhead to manage”
This is true only if your process adds overhead per story (e.g., heavyweight estimation ceremonies, multi-level approval). The solution is to simplify the process, not to keep stories large. Overhead per story should be near zero for a well-decomposed story.
2. “Some things can’t be done in small batches”
Almost anything can be decomposed further. Database migrations can be done in backward-compatible steps. API changes can use versioning. UI changes can be hidden behind feature flags. The skill is in finding the decomposition, not in deciding whether one exists.
3. “We tried small stories but our throughput dropped”
This usually means the team is still working sequentially. Small stories require limiting WIP and swarming - see Limiting WIP. If the team starts 10 small stories instead of 2 large ones, they have not actually reduced batch size; they have increased WIP.
Measuring Success
| Metric | Target | Why It Matters |
|---|---|---|
| Development cycle time | < 2 days per story | Confirms stories are small enough to complete quickly |
| Integration frequency | Multiple times per day | Confirms commits are small and frequent |
| Release frequency | Daily or more | Confirms deploys are routine |
| Change fail rate | Decreasing | Confirms small changes reduce failure risk |
Next Step
Small batches often require deploying incomplete features to production. Feature Flags provide the mechanism to do this safely.